Quick Link
Quick Contact
Address
2E&3E,NO.256,MING XIN MIDDLE ROAD ,HUTANG TOWN, WUJIN DISTRICT CHANGZHOU, JIANGSU,CHINA
Tel
86-0519-88820881
Our Newsletter
Subscribe to our newsletter for discounts and more.
Before starting a warp knitting machine, operators should check the machine condition, yarn supply, guide components, and fabric take-up system. Proper preparation helps reduce unnecessary interruptions and supports stable production.
Changzhou Chenye Warp Knitting Machinery Co., Ltd. focuses on warp knitting equipment for net fabric manufacturing. Following a clear preparation procedure helps operators work more efficiently and maintain consistent production quality.
| Type | Size (L*W*H) | Weight (Kg) | Power (KW) | Speed (rpm) |
|---|---|---|---|---|
| SRCA-135 | 4300*2200*2700 | 4700 | 3 | 200-530 |
| SRCA-150 | 4900*2200*2700 | 5000 | 3 | 200-530 |
| SRCA-180 | 6100*2200*2700 | 7500 | 5.5 | 200-530 |
| SRCA-220 | 7300*2200*2700 | 9000 | 5.5 | 200-530 |
| SRCA-260 | 8200*2200*2700 | 11000 | 7.5 | 200-480 |
| SRCA-340 | 10300*2200*2700 | 14000 | 11 | 200-450 |
Correct yarn threading is an important step in warp knitting production. Yarn should follow the designated path through the relevant guide components to help prevent tangling, uneven feeding, and unnecessary yarn breakage.
Operators should follow the machine instructions and check the threading arrangement before production. Proper threading supports smoother machine operation and more consistent net fabric formation.
Changzhou Chengye Warp Knitting Machinery Co., Ltd. provides different machine models for various mesh manufacturing applications.Customers can communicate their target product specifications with the technical team before selecting equipment. This can help determine a machine configuration that is better suited to the planned production.For manufacturers developing lightweight mesh products, appropriate warp knitting machinery can provide a flexible foundation for continuous production.

